Chandrayaan-3 mission is scheduled for launch at 2.35 pm on July 14. The mission aims to achieve a soft landing on the lunar surface between August 23 -24.
The Indian space agency ISRO informed that the ‘Launch Rehearsal’ simulating the entire launch preparation and process lasting 24 hours has concluded on Tuesday.
The Indian space agency ISRO informed that the ‘Launch Rehearsal’ simulating the entire launch preparation and process lasting 24 hours has concluded on Tuesday.
Chandrayaan-3 spacecraft will be launched by Launch Vehicle Mark-III on Friday from Satish Dhawan Space Centre (SDSC), an island in the Rayalaseema region, Andhra Pradesh.(Isro)
LVM3 is ISRO’s heavy lift launch vehicle and has a remarkable track record of 6 successful missions in a row. This is the 4th operational flight of LVM3, intended to launch the Chandrayaan-3 spacecraft to Geo Transfer Orbit (GTO).